Source replacement blazer cloth and canvas
You are the purchasing officer in Supply and Dispatch.
What has happened
Two supply problems have arrived at once. The bottle green blazer cloth for the St Aidan's College order is down to 96 metres with 320 blazers still to cut, and the usual mill has a six-week lead time. The charcoal canvas for the Merriwa Holdings aprons failed receiving inspection because one roll is outside the shade band, and the work order is on hold. The General Manager wants a costed recommendation by Friday that keeps both deliveries on time, uses only suppliers with a current ethical sourcing declaration, and does not compromise the tech pack specifications.
Deliverables
- Fabric requirement calculations for both orders
- Two completed Materials Requisition Forms
- Quote comparison table with declaration status
- Updated stock records
- One-page recommendation to the General Manager
Documents to use
Systems to use
Materials and Trims Stock
Keeps the stock record for fabric rolls, leather hides, trims, thread and chemicals with location, quantity and supplier compliance status.
Tech Pack Register
Holds the product specification record for every style and controls which version Production is allowed to cut against.
Production Work Orders
Tracks every production, sample and repair job from release through cutting, sewing, finishing and dispatch.
Quality Inspection Log
Records receiving, cut, in-line and final inspections and the disposition of any nonconforming product.
Units of competency
Current on training.gov.au for the Textiles, Clothing and Footwear as at 10 September 2026.
MSTGN4026Source textile materials and resourcesMSTGN5015Work with local and international TCF supply chainsMSTGN3021Match fabrics to performance and handling requirementsMSTAT4023Interpret textile information and make production calculationsMSTGN3018Support sustainable practice in apparel and textile design and productionQualifications
MST40122Certificate IV in Textile Design and TechnologyMST50122Diploma of Apparel, Fashion and TextilesWhat to look for
Evidence guide
The requirement calculation must start from tech pack consumption and the remaining work order quantity, with allowances shown. Check that the student confirms declaration status before recommending a supplier and excludes any supplier without one. Stock records must reflect the quarantine and the orders raised. The recommendation must weigh cost against lead time and specification match, not price alone.